Is it difficult to park in a hospital? This hospital has a "major operation"!


Release time:

2023-11-21

There are limited parking spaces in the project hospital, and vehicles queue up for admission during rush hours, resulting in traffic jams around. Parking outside is easy to be posted by the traffic police, and the parking lot parked in the distance takes a long walk to reach the hospital, which increases the economic and physical burden of patients and their families. Therefore, Nangong City People's Hospital plans to build 4 groups of 7-story SUV garages and 6 groups of 7-story car garages to solve the major livelihood problem of parking difficulties.

Is it difficult to park in a hospital? This hospital has a "major operation"!

Project card:

Garage Name: Hebei Nangong People's Hospital Vertical Circulation Stereo Garage

Location of Garage: After the Outpatient Building of Nangong People's Hospital

Completion Date: August 2023

Device Type: Vertical Looping Class

Garage floors: Floor 7 above ground

Floor Area: about 2411.5 ㎡

Total number of parking spaces: 120

Entrance and Exit: 10

Access mode: Pour in and out

Access mode: License Plate Recognition

 

Project Address:

Project background:

There are limited parking spaces in the project hospital, and vehicles queue up for admission during rush hours, resulting in traffic jams around. Parking outside is easy to be posted by the traffic police, and the parking lot parked in the distance takes a long walk to reach the hospital, which increases the economic and physical burden of patients and their families.

As a result, Nangong People's Hospital plans to build 4 groups of 7-storey SUV garages and 6 groups of 7-storey car garages.In order to solve the major livelihood problems of parking.

Nangong People's Hospital

Project Scene

Project introduction:

Nangong City People's Hospital vertical circulation three-dimensional garage project aims to solve the problem of parking difficult for citizens.The project covers an area of 2411.5 square meters and has designed 120 parking spaces., Including 4 sets of 7-story SUV garages and 6 sets of 7-story car garages,Can meet 10 vehicles at the same time in and out.

The car parking area is limited to 5.3 meters long, 1.9 meters wide, 1.55 meters high and 2 tons heavy;

SUV parking area is limited to 5.3 meters long, 1.9 meters wide, 2 meters high and 2 tons heavy.

 

Before the owner of the car to the parking space, the ground sensor will automatically open the rolling door and guide the owner to drive the car into the parking space through voice prompts.

The mirror in front of the car is convenient for the owner to observe the surrounding situation.At the same time of parking, there will be voice prompts and LED display text prompts, prompting the owner to "continue to move forward" or "end of parking".

After completing the parking operation, the owner needs to pull the handbrake, close the doors and windows and take his belongings to leave the parking space. The remaining matters will be operated by the on-site staff.

When the car needs to be picked up, the owner can find the staff to control the equipment to pick up the car and follow the staff's command to drive the car out.